sort by date sort by cost
Total 4 entries found , Cost: 85.7 million FCFA
Apr 12, 2024 CR_NW SIGNE 60.2 million FCFA 012/JO/NWRA/ITB/2024
Phase 2 and final Construction of a multipurpose laboratory at GBHS Ndop (lot 2)
Prestataire: ETS ASHIMINYI INACTIF
2023 CR_NW ATTRIBUE
Phase 1 Construction of a multipurpose laboratory at GBHS Ndop in Ngoketunjia Division
Prestataire: ETS ASHIMINYI
2021 C_BENAKUMA ATTRIBUE
Construction of a block of two classrooms equipped with benches Head teachers office and toilets: Lot 1
Prestataire: ETS ASHIMINYI
Jul 15, 2020 C_MBANDJOCK SIGNE 25.5 million FCFA 03/LC/MINDDEVEL/RCE/DHS/CMBA/SG/20
ODOCK (Mekomba) : Construction d`un forage PMH
Prestataire: ETS ASHIMINYI INACTIF

Top Prestataires