sort by date sort by cost
Total 2 entries found , Cost: 34.0 million FCFA
Jul 06, 2022 C_BETARE-OYA RECEPTIONNE 17.0 million FCFA 07/LC/CBO/SG/CIPM/2022
Construction d`un blocs de deux salles de classe à EP de tibanga . Lot 1
Prestataire: ETS ANOUMBOUDEM MULTIPLE
Jul 06, 2022 C_BETARE-OYA RECEPTIONNE 17.0 million FCFA 08/LC/CBO/SG/CIPM/2022
Construction d`un blocs de deux salles de classe à l` EP de Mbal. Lot 2
Prestataire: ETS ANOUMBOUDEM MULTIPLE

Top Authorities
Top Prestataires
Top Dates