Jun 06, 2022
C_REY BOUBA
RECEPTIONNE
8.0 million
FCFA
002/LC/CRB/SG/2022
Equipement en matériel médical du CSI de Badjari, lot 1
Jun 06, 2022
C_REY BOUBA
RECEPTIONNE
8.0 million
FCFA
001/LC/CRB/SG/2022
Equipement en matériel médical du CSI de Rey Manga, lot 2
Jan 31, 2022
C_DIR
SIGNE
91.7 million
FCFA
007/M/C.DIR/CIPM/2022
TRAVAUX DE CONSTRUCTION DE 03 BLOCS DE 02 SALLES DE CLASSE AVEC BLOC ADMINISTRATIF EQUIPEES DE 60 TABLE BANCS ET UN BLOC LATRINES ECOLOGIQUES A 03 CABINES CHACUN DANS LES EP DE DJEREM KABAWA EP KELA-SAMI ET EP DE WAAH