sort by date sort by cost
Total 4 entries found , Cost: 117.1 million FCFA
Nov 07, 2022 C_MOUTOURWA SIGNE 17.1 million FCFA 15/LC/C.MTWA/CIPM/2022
Travaux de cantonnage sur le tronçon de route National bitumé...PK 182+500 (37,500 KM)
Prestataire: ETS AJERAM MISSING
Jun 24, 2022 C_MOUTOURWA SIGNE 30.0 million FCFA 01/LC/C.MTWA/CIPM/2022
Construction du marché a bétail de Moutourwa
Prestataire: ETS AJERAM MISSING
Jun 24, 2022 C_MOUTOURWA SIGNE 35.0 million FCFA 03/LC/C.MTWA/CIPM/2022
Finition des travaux du CSI de Mogong
Prestataire: ETS AJERAM MISSING
May 12, 2021 C_MOUTOURWA RECEPTIONNE 34.9 million FCFA 03/LC/C.MTWA/CIPM/2021
Réhabilitation du CSI de Damai
Prestataire: ETS AJERAM MISSING

Top Authorities
Top Prestataires
Top Dates