sort by date sort by cost
Total 7 entries found , Cost: 171.3 million FCFA
Sep 02, 2019 C_MOKOLO RECEPTIONNE 50.0 million FCFA 019/LC/C-MOK/TBEC/2019
Construction du centre de santé de TOUROU
Prestataire: ETS ABBA ADAM AROUNA MULTIPLE
Jul 04, 2019 C_MOKOLO RECEPTIONNE 22.7 million FCFA 012/LC/C-MOK/TBEC/2019
Entretien des routes urbaines et périphériques de la ville: CONSTRUCTION D’UN DALOT DOUBLE DE 2 X 2 X 2 AU LIEUDIT MAYO-DORVA ET D’UN DALOT DOUBLE DE 2 X 1 X 1 AU LIEU DIT KOUDEKOKWE FACE DOMICILE ALHADJI BOUKAR
Prestataire: ETS ABBA ADAM AROUNA MULTIPLE
Jun 12, 2019 C_MOKOLO RECEPTIONNE 17.5 million FCFA 011/LC/C-MOK/CIPM/AG/2019
FOURNITURE DES MATERIELS PEDAGOGIQUES SCOLAIRES AUX ECOLES PUBLIQUES PRIMAIRES RELEVANT DE L`INSPECTION D`ARRONDISSEMENT DE L`EDUCATION DE BASE (lAEB) DE MOKOLO. LOT 2 : Fournitures des Kitd`Hygiène
Prestataire: ETS ABBA ADAM AROUNA MULTIPLE
May 16, 2019 C_MOKOLO RECEPTIONNE 20.0 million FCFA 009/LC/C-MOK/TBEC/2019
CONSTRUCTION DE DEUX DALOTS SIMPLES DE 1 X 1 AUX LIEUDITS FACE CAMWATER ET LDAMANG lot 2
Prestataire: ETS ABBA ADAM AROUNA MULTIPLE
May 15, 2019 C_MOKOLO RECEPTIONNE 27.6 million FCFA 008/LC/C-MOK/TBEC/2019
Réhabilitation de la route communale KOSSEHONE-WOULA-HANKO-MAXI-MABASS-WANDA
Prestataire: ETS ABBA ADAM AROUNA MULTIPLE
Mar 29, 2019 C_MOKOLO RECEPTIONNE 25.0 million FCFA 005/LC/C-MOK/TBEC/2019
EM de ZILING : Construction d`un bloc maternel de 02 salles de classe
Prestataire: ETS ABBA ADAM AROUNA MULTIPLE
Mar 29, 2019 C_MOKOLO RECEPTIONNE 8.5 million FCFA 004/LC/C-MOK/AG/2019
CSI de GOULVA-MOMBOI (Mokong) :Equipement en énergie solaire
Prestataire: ETS ABBA ADAM AROUNA MULTIPLE

Top Authorities
Top Prestataires
Top Dates