sort by date sort by cost
Total 3 entries found , Cost: 82.1 million FCFA
2024 C_DZIGUILAO ATTRIBUE
EP DE GOLONGHINI 2 : Construction d’un bloc de deux salles de classe (lot 1)
Prestataire: ENTREPRISE FERRET
Jun 12, 2024 C_DZIGUILAO SIGNE 19.0 million FCFA 001/LC/C.DLAO/CIPM/TBEC/2024
EP DE GOLONGHINI 2 : Construction d’un bloc de deux salles de classe (lot 1)
Prestataire: ENTREPRISE FERRET
Aug 13, 2018 C_KAELE SIGNE 63.1 million FCFA 03/M/C-KLE/CIPM/AI/2017
TRAVAUX CONSTRUCTION D UN BLOC ADMINISTRATIF
Prestataire: ENTREPRISE FERRET INACTIF

Top Prestataires
Top Dates