sort by date sort by cost
Total 2 entries found , Cost: 41.9 million FCFA
Jun 06, 2019 C_TOUBORO SIGNE 18.0 million FCFA 004/LC/MO/C-TBRO/SG/CDPM/2019
Construction d`un bloc de deux salles de classe à l`EP ELEPHANT (lot 2)
Prestataire: ENTREPRISE BOUBA TOUMBA INACTIF
Jul 31, 2018 SODECOTON RECEPTIONNE 23.9 million FCFA 055A/18/LC/SDCC/CIPM
Travaux de construction dans les usines de NGONG (lot1) et KAELE (lot2) à la SODECOTON.

Top Dates