sort by date sort by cost
Total 8 entries found , Cost: 88.5 million FCFA
2023 C_DOUALA_IV ATTRIBUE
Travaux de construction d`un pont en béton armé à poutre métallique sur le troçon Ndobo-Cimétière Bojongo
2023 C_DOUALA_IV ATTRIBUE
Construction du poste agricole de BONADALE
2023 PREF_WOURI ATTRIBUE
Construction l`Inspection d`Arrondissement de l`Education de Base SDIBE DOUALA 6
Sep 14, 2023 C_DOUALA_V SIGNE 18.0 million FCFA 011/LC/AONO/CAD5/CIPM/23
CONSTRUCTION D`UN FORAGE DANS CERTAINES ECOLES PUBLIQUES
Aug 20, 2023 PREF_WOURI SIGNE 30.0 million FCFA 05/D/PREFECTURE/W/2023
Construction l`Inspection d`Arrondissement de l`Education de Base SDIBE DOUALA 6
Jun 16, 2023 C_DOUALA_IV SIGNE 22.7 million FCFA 002/LC/CAD4/CIPM/2023
Construction du poste agricole de BONADALE
Mar 23, 2023 C_DOUALA_V SIGNE 8.9 million FCFA 003/LC/AONO/CAD5/CIPM/23
Construction d`un forage à bonamoussadi village (LOT2)
Mar 23, 2023 C_DOUALA_V SIGNE 8.9 million FCFA 03/LC/AONO/CAD5/CIPM/23
Construction d`un forage à l`école publique de bonamoussogo (LOT1)

Top Dates