TRAVAUX DE REHABILITATION DE LA ROUTE NGON OVANGOUL ET CONSTRUCTION D`UN OUVRAGE DE FRANCHISSEMENT DALOT SIMPLE
CONSTRUCTION AND INSTALLATION WORKS IN THE CDC GROUP BANANA - Lot 4 Construction of a Double Cell Reinforced Culvert at Benoe Estate Main Road, CDC Tiko
CONSTRUCTION AND INSTALLATION OF PORTABLE WATER FILTRATION SYSTEMS IN CDC BANANA DEPARTMENT (Lot 2 - Construction/Installation of Portable Water Filtration System at Benoe)
Nov 14, 2017
MINSANTE
SIGNE
17.9 million
FCFA
031/JO/PR/MINMAP/SWRD/SWRTB/2017
CONSTRUCTION OF A STORE AT THE HEMODIALYSIS CENTER, BUEA.
Aug 10, 2017
DR_MINEE_SW
SIGNE
14.8 million
FCFA
012/JO/PRMINMAP/SWRD/SWRTB/2017
SUPERVISION/CONTROL OF THE REHABILITATION OF WATER SUPPLY PROJECT IN ISANGELE-BAKASSI
Aug 09, 2017
CDC
SIGNE
31.3 million
FCFA
4852/CDC/014/GBM/ITB/17
CONSTRUCTION AND INSTALLATION OF PORTABLE WATER FILTRATION SYSTEMS IN CDC BANANA DEPARTMENT (Lot 1 - Construction/Installation of Portable Water Filtration System at Moquo Clinic)