sort by date sort by cost
Total 2 entries found , Cost: 39.9 million FCFA
Sep 06, 2021 C_GAROUA-BOULAI SIGNE 19.4 million FCFA 027/LC/CGB/SG/CIPM/2021
TRAVAUX DE CONSTRUCTION D`UN PARC D`INTERVENTION ZOOSANITAIRE EQUIPE D`UN BLOC LATRINES DANS LA LOCALITE DE BINDIBA
Prestataire: CK CONSTRUCTION MULTIPLE
Aug 10, 2021 DR_MINCOMMERCE_NW SIGNE 20.5 million FCFA 001/JO/MINAT/GOV/NW/SG/2021
Acquisition of furniture
Prestataire: CK CONSTRUCTION MULTIPLE

Top Prestataires
Top Dates