sort by date sort by cost
Total 3 entries found , Cost: 65.3 million FCFA
2019 DR_MINAS_LT ATTRIBUE
DOUALA DEIDO (LITTORAL) : Réhabilitation du bureau de poste
Prestataire: CETECH SARL
Oct 30, 2019 PREF_WOURI SIGNE 55.4 million FCFA MARCHE N°03/M/DGI/R-CDI-AKWA/CDPM/2019
TRAVAUX DE REHABILITATION/RENOVATION DES CDI RENOVES DE DOUALA POUR LE COMPTE DE LA DIRECTION GENERALE DES IMPOTS LOT 5: LOGBABA
Prestataire: CETECH SARL
Sep 30, 2019 DR_MINAS_LT SIGNE 9.9 million FCFA 012/LC/C/SP/CRPM-LT/2019
Réhabilitation du DRAS Littoral
Prestataire: CETECH SARL

Top Prestataires
Top Dates