sort by date sort by cost
Total 9 entries found , Cost: 288.0 million FCFA
For the construction socioeconomic infrastructures relating to some border kits in Nwa, for the construction of a block of toilet in GNS SIH in NWA
For the construction socioeconomic infrastructures relating to some border kits in Nwa, for the construction of a block of two classroom at G.S Fetop Nwa
For the construction socioeconomic infrastructures relating to some border kits in Nwa, for the construction of block of two (02) classrooms at G.S NWA
For the construction socioeconomic infrastructures relating to some border kits in Nwa, for the construction of a block of two (02) classrooms at G.S Bomgor
For the construction socioeconomic infrastructures relating to some border kits in Nwa, for the construction of an administrative block in GNS SIH NWA
Dec 21, 2018 MINEPAT SIGNE 99.7 million FCFA 278/M/MINEPAT/CMSPM/2018
Travaux d`électrification rurale de certaines localités du département du Diamaré
Apr 17, 2018 MIDIMA SIGNE 59.4 million FCFA 02/M/MIDIMA/PERPREN/CIPM-TAI/2018
Construction réseaux MT/BT 10 villages Lot 7
Apr 17, 2018 MIDIMA SIGNE 85.0 million FCFA 03/M/MIDIMA/PERPREN/CIPM-TAI/2018
Construction réseaux MT/BT 10 villages Lot1
Apr 17, 2018 MIDIMA SIGNE 43.9 million FCFA 01/M/MIDIMA/PERPREN/CIPM-TAI/2018
Construction réseaux MT/BT 10 villages Lot 2

Top Dates