sort by date sort by cost
Total 4 entries found , Cost: 81.3 million FCFA
Aug 04, 2022 C_MASSOCK SIGNE 23.0 million FCFA LC n°001/LC/SG/C.MSK/2022
Construction d`un magasin de stockage à Songmbengue
Aug 04, 2022 C_MASSOCK SIGNE 25.0 million FCFA LC n°002/LC/SG/C.MSK/2022
Construction d`un hangar de marché à Nkom
Jul 12, 2022 C_NGAMBE SIGNE 17.0 million FCFA 07/LC/C.NGBE/CIPM/2022
Construction des logements d`astreintes pour enseignants ( 01 bloc de 02 logements)
May 19, 2021 C_NGAMBE SIGNE 16.3 million FCFA 03/LC/C.NGBE/CIPM/2021
CONSTRUCTION D’UN BLOC DE DEUX SALLE DE CLASSE A L’EP DE POUTKAK
Prestataire: BATI-GENIE ET SERVICES SARL 10months

Top Dates