sort by date sort by cost
Total 9 entries found , Cost: 908.1 million FCFA
May 18, 2022 C_NKONDJOCK SIGNE 99.9 million FCFA 006/LC/C.NKONDJOCK/SG/2022
Travaux de réhabilitation de la voirie pour la construction des carniveaux en beton armé au Centre ville de Nkondjock
Prestataire: ALL BUILDING COMPANY MULTIPLE
Jul 12, 2021 C_NKONDJOCK SIGNE 49.3 million FCFA 005/LC/CNK/SG/CIPM/2021
Réhabilitation des tronçons de routes communales. T1: Carrefour Kouedjou-Village (1.6km); T2: Carrefour Tam-tam -Village (1.5km); T3: Carrefour Matin-Minée (1.7km)
Prestataire: ALL BUILDING COMPANY MULTIPLE
Mar 23, 2021 C_NKONDJOCK SIGNE 26.7 million FCFA 002/LC/C.NKONDJOCK/CIPM/2021
Réhabilitation de la route communale KODOCK-DIDIPE
Prestataire: ALL BUILDING COMPANY MULTIPLE
Mar 19, 2021 C_NKONDJOCK SIGNE 99.9 million FCFA 001/M/C.NKONDJOCK/CIPM/2021
Ouverture de la route communale MALEBIS-Fleuve NKAM
Prestataire: ALL BUILDING COMPANY MULTIPLE
Sep 17, 2020 CFC SIGNE 116.9 million FCFA 14/M/CFC/CIPM/2020
MISE AUX NORMES DE LA SALLE INFORMATIQUE DE L’AGENCE RÉGIONAL DU SUD
Prestataire: ALL BUILDING COMPANY MULTIPLE
Apr 24, 2020 HILTON SIGNE 173.3 million FCFA 07/M/CHC/HILTON/CIPM/2020
Travaux d`étanchéité de la toiture du HILTON Yaoundé
Prestataire: ALL BUILDING COMPANY MULTIPLE
Jun 27, 2019 MINHDU SIGNE 180.0 million FCFA 58/E/2/M/MINHDU/CIPM/19
Entretien des voiries revêtues dans certaines villes des régions du littoral, NW et SW
Prestataire: ALL BUILDING COMPANY MULTIPLE
Feb 04, 2019 CFC SIGNE 81.0 million FCFA 001/M/CFC/CIPM/2019
TRAVAUX DE REFECTION DE L`ETANCHEITE DE L`IMMEUBLE SIEGE DU CFC
Prestataire: ALL BUILDING COMPANY MULTIPLE
Feb 04, 2019 CFC ATTRIBUE 81.0 million FCFA 001/M/CFC/CIPM/2019
TRAVAUX DE REFECTION DE L`ETANCHEITE DE L`IMMEUBLE SIEGE DU CFC
Prestataire: ALL BUILDING COMPANY MULTIPLE

Top Prestataires