sort by date sort by cost
Total 106 entries found , Cost: 1.3 billion FCFA
Jun 12, 2019 C_DEUK SIGNE 7.9 million FCFA 004../LC/C/DK/SG/SPM/CDPM-MI/2019
CONSTRUCTION DE SIX (06) FORAGES EQUIPES DE PMH DANS LA COMMUNE DE DEUK Lot 3:village KOP
Prestataire: AIR FORAGE SARL INACTIF
May 22, 2019 DR_MINEE_SU SIGNE 55.0 million FCFA 003/M/MINAT/RS/SG/CRPM/19
ADDUCTION EN EAU POTABLE DIKOBE
Prestataire: AIR FORAGE SARL INACTIF
May 12, 2019 C_NANGA_EBOKO SIGNE 7.9 million FCFA 004/LC/RCE/DHS/CNE/SG/19
Construction des forages équipés de PMH :lot 1 (Bissagha)
Prestataire: AIR FORAGE SARL INACTIF
Apr 24, 2019 C_EBEBDA RECEPTIONNE 23.9 million FCFA 10/LC/C.EBDA/CIPM/2019
CONSTRUCTION DE SIX FORAGES EQUIPES DE PMH A LA CHEFFERIE ZOKOGO CES LEKA NLONG ZOCA
Prestataire: AIR FORAGE SARL INACTIF
Apr 24, 2019 C_EBEBDA RECEPTIONNE 23.9 million FCFA 11/LC/C.EBDA/CIPM/2019
CONSTRUCTION DE XIX FORAGES EQUIPES DE PMH EN DEUX LOTS A BIKOGA EBONG NSIMALEN
Prestataire: AIR FORAGE SARL INACTIF
Apr 15, 2019 C_NANGA_EBOKO RECEPTIONNE 8.0 million FCFA 19//LC/HS/CIMP/2019
Construction des forages équipés de PMH : lot 2 ( Koabang)
Prestataire: AIR FORAGE SARL INACTIF

First Page 2 of 2
Top Prestataires