Total
53156
entries found
, Cost: 4.7 trillion FCFA
Apr 07, 2023
C_SANTA
SIGNE
50.0 million
FCFA
06/JO/SC/SCITB/2023
Extension of Electricity from Pa Tamafor junction toward Dr Chebo to Mile 3 Akum
Apr 07, 2023
C_KUMBA_III
SIGNE
20.0 million
FCFA
N01/JO/KUMBA III/MEME/ITB/2023
Supply of medical equipment at CMA Ntam and IHC Barombi kang.
Apr 07, 2023
C_SANTA
SIGNE
35.0 million
FCFA
02/JO/SC/SCITB/2023
Construction of bridge over River NOGLEE
Apr 07, 2023
C_BELO
SIGNE
10.0 million
FCFA
01/JO/MINDDEVEL/BC/BCITB/2023
Supply of Equipment and Materials for the Management of Waste in Belo Municipality.
Apr 07, 2023
C_SANTA
SIGNE
27.0 million
FCFA
03/JO/SC/SCITB/2023
Maintenance of Hausa Quarter Ntarreh road Sohie to CDSTC roads
Apr 07, 2023
C_BELO
SIGNE
46.8 million
FCFA
02/JO/MINDDEVEL/BC/BCITB/2023
Supply of 750 small ruminants 10 pigs and 2000 broilerts for sustainable livestock development in communities in belo
Apr 07, 2023
C_NWA
SIGNE
27.0 million
FCFA
004/JO/MINDDEVEL/NWR/DMD/NC/NCITB/2023
Maintenance of the communal Road LIH-KOP TO SHARP CORNER
Apr 07, 2023
C_BELO
SIGNE
40.0 million
FCFA
03/JO/MINDDEVEL/BC/BCITB/2023
Construction of the NGOH-NGANG bridge linking KITCHU and SHO Villages.
Apr 07, 2023
C_SANTA
SIGNE
25.0 million
FCFA
04/JO/SC/SCITB/2023
Grading of road from Baligham Palace junction to Limit West Region 7.6km
Apr 07, 2023
C_SANTA
SIGNE
65.0 million
FCFA
01/JO/SC/SCITB/2023
Construction of bridge over river Akakne
Apr 07, 2023
C_SANTA
SIGNE
44.7 million
FCFA
07/JO/SC/SCITB/2023
Rehabilitation of Santa Water project
Apr 06, 2023
C_LOGONE_BIRNI
RECEPTIONNE
25.0 million
FCFA
001/LC/C.L.BIRNI
Travaux Construction d`un ¨Poste Agricole à KIDAM dans la Commune de Logone Birni.
Apr 06, 2023
C_MASSANGAM
SIGNE
49.7 million
FCFA
05/LC/MASSANGAM/MO/CIPM-AI/2023
Electrification en MT monophasé du village Mamognam
Apr 06, 2023
C_BUEA
SIGNE
9.6 million
FCFA
004/JO/BUEA COUNCIL/BCTB/2023
Rehabilitation of GS Buea town I LOT 1
Apr 06, 2023
C_BUEA
SIGNE
6.0 million
FCFA
001/1/JO/BUEA COUNCIL/BCTB/2023
Equipment of WEYOKOWELI literacy center LOT2
Apr 06, 2023
PREF_MBERE
SIGNE
40.0 million
FCFA
002/LC/PREFET-MB/CDPM-MB/2023
Réhabilitation de la prison principale de Meiganga
Apr 06, 2023
C_BUEA
SIGNE
14.5 million
FCFA
003/JO/BUEA COUNCIL/BCTB/2023
Construction of fence at the women and empowerment center Buea
Apr 06, 2023
C_BAMENDA_III
SIGNE
21.0 million
FCFA
08/JO/BIIIC/BIIICITB/PIB/2023
Construction of two (02) classrooms and Head Teacher’s office at G.S Ntambang
Apr 06, 2023
C_BUEA
SIGNE
100.0 million
FCFA
007/JO/BUEA COUNCIL/BCTB/2023
Rehabilitation of road from Bocom mile16 to Etah Palace`s residence
Apr 06, 2023
PREF_MBERE
SIGNE
8.0 million
FCFA
003/LC/PREFET-MB/CDPM-MB/2023
Aménagement de la Délégation Départementale du MINEPAT DU MBERE
Apr 06, 2023
C_BAMENDA_I
SIGNE
18.5 million
FCFA
01/RQ/BICITB/BIC/BISD/Mezam/NWR/2023
Rehabilitation of G.S Station Bamenda 1 Council area Mezam Division North West Region
Aménagement de route Afapakoung-Essabah-Petite Chapelle Ndanko et bretelle Essabah-Assock
Apr 06, 2023
C_BUEA
SIGNE
27.0 million
FCFA
006/JO/BUEA COUNCIL/BCTB/2023
Concreting and building of gutters from slaughter house Buea town to Wonya-mongo
Apr 06, 2023
PREF_MBERE
SIGNE
20.0 million
FCFA
001/LC/PREFET-MB/CDPM-MB/2023
Equipement de la Préfecture de Meiganga
Apr 06, 2023
C_BUEA
SIGNE
5.9 million
FCFA
001/JO/BUEA COUNCIL/BCTB/2023
Equipment of BAWODVIS literacy center LOT1
Apr 06, 2023
C_BAMENDA_I
SIGNE
20.0 million
FCFA
02/RQ/BICITB/BIC/BISD/Mezam/NWR/2023
Supply of benches to G.S Abangoh, G.S Station, G.S Ntoh, Ecol de Champion and Ecol public Bamenda 1 Council area Mezam Division North West Region
Apr 06, 2023
CUD
SIGNE
25.0 million
FCFA
05/LC/CUD/SG/DSGP/SDPM/2023
Fourniture des pneumatiques pour le matériel roulant de la CUD
Apr 06, 2023
PEPS
SIGNE
14.9 million
FCFA
011/LM/MINEPAT/SG/PEPS/CSPM/SPM/2023
Acquisition des logiciels de modélisation macroéconomique
Apr 06, 2023
C_BAMENDA_I
SIGNE
27.0 million
FCFA
04/ONIT/BICITB/BIC/BISD/Mezam/NWR/2023
Opening /grading of road and the construction of culverts from Ta Tighe’s entrance through pa Ndifor George – GTHS Bamendankwe 3.5km in Bamenda I Council area, Mezam Division, North West Region
Apr 06, 2023
C_BANKIM
SIGNE
70.0 million
FCFA
01/M/R-AD/D-M°BYO/C-BKIM/CIPMP/2023
Réhabilitation de la route communale SONGKOLONG - MBIRIDJOM-ALI-MALI (29,2 km) avec construction des ouvrages de franchissement
Apr 06, 2023
PREF_MBERE
SIGNE
36.8 million
FCFA
004/LC/REFET-MB/CDPM-MB/2023
Construction d’un bloc de 03 salles de classe + 02 bureaux au CETIC de KOMBO-LAKA
Apr 06, 2023
C_BUEA
SIGNE
10.0 million
FCFA
002/JO/BUEA COUNCIL/BCTB/2023
Construction of the Glass enclosure of the open balconies of the new council building
Apr 06, 2023
C_BANKIM
SIGNE
12.0 million
FCFA
03/LC/R-AD/D-M°BYO/C-BKIM/CIPMP/2023
Construction d`un bloc administratif pour le Centre Fonctionnel d`Alphabétisation (CAF) de Nyamboya
Apr 06, 2023
C_BUEA
SIGNE
15.0 million
FCFA
005/JO/BUEA COUNCIL/BCTB/2023
Renovation of customary court centres at Bojongo
Apr 06, 2023
C_BANKIM
SIGNE
35.0 million
FCFA
01/LC/R-AD/D-M°BYO/C-BKIM/CIPMP/2023
Travaux d`ouverture de trois routes communales sur trois axes: Axe 1: MGBETOH (RN6) - BORD DU FLEUVE MBAM (longueur 4,5 km); Axe 2: Mapé-cité - BORD DU MBAM (longueur 3km); Axe 3: CARREFOUR MBOUGAM - BORD DU MBAM (longueur 2,5 km
Apr 06, 2023
C_BUEA
SIGNE
17.8 million
FCFA
004/1/JO/BUEA COUNCIL/BCTB/2023
Rehabilitation of GS Bwiyuku LOT 2
Apr 06, 2023
C_BAMENDA_I
SIGNE
27.5 million
FCFA
03/ONIT/BICITB/BIC/BISD/Mezam/NWR/2023
Opening and grading of farm to market roads from Bangshie market to GSS Bangshie and from Ajaman to Nesirine Bamenda 1 Council area Mezam Division North West Region
Apr 06, 2023
C_BUEA
SIGNE
18.0 million
FCFA
004/2/JO/BUEA COUNCIL/BCTB/2023
Rehabilitation of GS Rojoke LOT 3
Apr 06, 2023
HGD
SIGNE
80.0 million
FCFA
Mn°002/MP/HGD/CIPM/2023
Activités de gardiennage, de surveillance et de contrôle des accès
Apr 06, 2023
C_BANKIM
SIGNE
40.0 million
FCFA
02/LC/R-AD/D-M°BYO/C-BKIM/CIPMP/2023
Travaux de réhabilitation de certains tronçons de route dans la Commune de Bankim; tronçon N°1: Nyakong-Mouko (longueur 13 km), tronçon N°2: Bandam-Ancien Bandam (longueur 18 km)
Apr 05, 2023
C_NKAMBE
SIGNE
38.0 million
FCFA
008/JO/NWR/DMD/NK.C/NK.CITB/2023
Supply and installation of security solar street lighting in some needy public places in nkambe council area
Apr 05, 2023
C_BAFOUSSAM_II
SIGNE
50.0 million
FCFA
01/LC/CABAFII/CIPM/ROUTES/2023
Travaux de construction d’un pont au lieu dit 2 ponts sur la rivière reliant les villages bandeng et banefo
Apr 05, 2023
C_BAFOUSSAM_II
SIGNE
72.0 million
FCFA
01/M/CABAFII/CIPM/AI/2023
TRAVAUX DE CONSTRUCTION DES BOUTIQUES AU QUARTIER TOUGANG VILLE
Apr 05, 2023
C_BAFOUSSAM_II
SIGNE
28.0 million
FCFA
05/LC/CABAFII/CIPM/AI/2023
Projet d’adduction en eau potable à forage de pompe solaire dans le village balatchouet
Apr 05, 2023
PREF_MEZAM
SIGNE
9.5 million
FCFA
01/JO/RQ/EFAS/Mezam-DTB/2023
Rehabilitation of the divisional delegation of public contracts – mezam
Apr 05, 2023
C_BAFOUSSAM_III
SIGNE
28.2 million
FCFA
01M/LC/CABAFIII/CIPM/2023
Travaux de construction d’un dalot de (2.5X2.5X7m) sur la rivière reliant KAMKOP à KENA I en contre bas face hôtel MBE SOH MBE y compris aménagement des voies d’accès dans la commune d’arrondissement de Bafoussam 3ème
Apr 05, 2023
SUP'PTIC
SIGNE
14.3 million
FCFA
23/0747/SUPPTIC/CIPM//2023
Acquisition de 230 chaises à l` ENSPT/SUPPTIC
Apr 05, 2023
CAMWATER
SIGNE
270.5 million
FCFA
000001/M/CAMWATER/DG/CIPM/2023
FOURNITURE DES PRODUITS DE TRAITEMENT DE L`EAU EN 4 LOTS (lot1)
Apr 04, 2023
C_NKAMBE
RECEPTIONNE
15.0 million
FCFA
017/JO/NWR/DMD/NK.C/NK.CITB/2023
Maintenance and upgrade in training centers of women empowerment and the family in Nkambe Council area.
Apr 04, 2023
C_NGUELEBOK
RECEPTIONNE
25.0 million
FCFA
010/LC/RE/DK/CIPM/2023
Travaux d’éclairage public par 15 lampadaires solaires à BELLO lot 2
Apr 04, 2023
C_NKAMBE
RECEPTIONNE
35.0 million
FCFA
004/JO/NWR/DMD/NK.C/NK.CITB/2023
Construction and rehabilitation of road works within nkambe town
Apr 04, 2023
C_NGUELEBOK
RECEPTIONNE
100.0 million
FCFA
008/M/RE/DK/C.NGBK/CIPM/2023
Acquisition et pose de 60 lampadaires pour éclairage public
Apr 04, 2023
C_NKAMBE
RECEPTIONNE
25.0 million
FCFA
005/JO/NWR/DMD/NK.C/NK.CITB/2023
Disenclavement works on the road from Binju to Kungi
Apr 04, 2023
C_NKAMBE
RECEPTIONNE
20.0 million
FCFA
010/JONWR/DMD/NK.C/NK.CITB/2023
Rehabilitation works(phase 2) at Nkambe community hall
Apr 04, 2023
SONARA
SIGNE
41.9 million
FCFA
027.22/M/SONARA/2023
LA FOURNITURE ET L`INSTALLATION DU PACKAGE DE MATERIEL DE GESTION DE LA PRISE D`INVENTAIRE DES IMMOBILISATION A LA SONARA
Apr 04, 2023
C_NKAMBE
SIGNE
20.0 million
FCFA
011/JO/NWR/DMD/NK.C/NK.CITB/2023
Maintenance and management of community green spaces in Nkambe town
Apr 04, 2023
C_MENGANG
SIGNE
30.0 million
FCFA
019/LC/CMENGANG/CIPM/MG/2022
CONSTRUCTION D UN CENTRE ZOOTECHNIQUE ET VETERINAIRE PU
Apr 04, 2023
C_NKAMBE
SIGNE
23.0 million
FCFA
013/JO/NWR/DMD/NK.C/NK.CITB/2023
Income generating agricultural inputs and scheme for food security
Apr 04, 2023
C_NYAMBAKA
SIGNE
40.0 million
FCFA
02/LC/CNY/SG/SIGAMP/CIPM/2023
Construction d`un bloc de 14 boutiques au Marché de NYAMBAKA
Apr 04, 2023
C_NKAMBE
SIGNE
16.0 million
FCFA
014/JO/NWR/DMD/NK.C/NK.CITB/2023
Development of pasture production center
Apr 04, 2023
C_NWA
SIGNE
35.0 million
FCFA
06/JO/MINDDEVEL/NWR/DMD/NC/NCITB/2023
Construction of a bridge over river NTEN-TEH and masonry box culvert with a reinforced concrete slab along the MFUMTE - GOM road NWA Sub Division
Apr 04, 2023
CR_SU
SIGNE
30.0 million
FCFA
010/LC/RS/CRS/2023
ÉQUIPEMENT EN MATÉRIEL MÉDICAL DANS CERTAINES FORMATIONS SANITAIRES DE LA RÉGION DU SUD
Apr 04, 2023
C_NKAMBE
SIGNE
27.0 million
FCFA
007/JO/NWR/DMD/NK.C/NK.CITB/2023
Construction of (08) market sheds and a toilet block at BINSHUA cattle market
GHS Nyanji: construction of a block of 3 classrooms with 2 offices
Apr 04, 2023
C_NKAMBE
SIGNE
22.0 million
FCFA
003/JO/NWR/DMD/NK.C/NK.CITB/2023
Construction of a block of two classrooms GS KUDU
Apr 04, 2023
C_NKAMBE
SIGNE
12.0 million
FCFA
016/JO/NWR/DMD/NK.C/NK.CITB/2023
For the supply of didactic material for some functional Literacy centers Binka, Kup, Njap Tabenken
Apr 04, 2023
C_NKAMBE
SIGNE
44.7 million
FCFA
009/JO/NWR/DMD/NK.C/NK.CITB/2023
Construction of a drinking water scheme around Mbumakop phase 1
Apr 04, 2023
C_NKAMBE
SIGNE
20.0 million
FCFA
015/JO/NWR/DMD/NK.C/NK.CITB/2023
Equipment of the council guest house for the teaching and support staff of nursery and primary schools in Nkambe council area
Apr 04, 2023
CR_SU
SIGNE
20.0 million
FCFA
009/LC/RS/CRS/2023
TRAVAUX DE RENFORCEMENT DE L`ALIMENTATION HTA/BT DE L`IMMEUBLE SIÈGE DU CONSEIL RÉGIONAL DU SUD
Apr 03, 2023
CAMWATER
RECEPTIONNE
484.1 million
FCFA
000004/M/CAMWATER/DG/CIPM/2023
FOURNITURE DES PRODUITS DE TRAITEMENT DE L`EAU EN 4 LOTS (lot2)
Apr 03, 2023
C_NGUELEBOK
RECEPTIONNE
20.0 million
FCFA
004/LC/RE/DK/C.NGBK/CIPM/2023
Travaux de réhabilitation du CMA de NGUELEBOK
Apr 03, 2023
C_NGUELEBOK
RECEPTIONNE
27.0 million
FCFA
001/LC/RE/DK/C.NGBK/CIPM/2023
Traitement des points critiques sur l’axe BADONGOUE - BITAMYEN
Construction sur la route communale Inter N°6 KENA-DJUKOU d’un pont en béton armé (porté 12m, Hauteur des culés7m) dans l’arrondissement de Bafoussam 3ème
Apr 03, 2023
CAMWATER
SIGNE
270.5 million
FCFA
007/M/CAMWATER/DG/CIPM/2023
ACQUISITION EN URGENCE ET LE TRANSPORT DES PRODUITS CHIIQUES DE TRAITEMENT DE L`AEU A LA CAMWATER EN 4 LOTS
(lot1)
Apr 03, 2023
C_BAFOUSSAM_III
SIGNE
63.8 million
FCFA
01/M/CABAFIII/CIPM/2023
Travaux de réhabilitation de la route communale bretelle chefferie Bamougoum-inspection d’Arrondissement de Baf 3-FAMKOUO-Sous-préfecture BAF 3 – école publique Kongso y compris la construction d’un pont en maçonnerie
Apr 03, 2023
ADC
SIGNE
30.4 million
FCFA
23/LC/ADC/CIPM/2023
POUR LA MISE EN PLACE DE LA COMTABILITE ANALYTIQUE ET DES OUTILS DE PREPARATION ET DE SUIVI BUDGETAIRE
Apr 03, 2023
C_BAMENDJOU
SIGNE
39.9 million
FCFA
09/LC/MINDDEVEL/C-BAM/CIPM/2023
Réhabilitation des EP de sangmete, EP Balatsit, EP Bilingue Bahouan
Apr 03, 2023
C_BAMENDJOU
SIGNE
50.0 million
FCFA
03/M/MINDDEVEL/C-BAM/CIPM/2023
Eclairage des voies publiques par panneaux solaires dans les 04 groupements de la Commune de Bamendjou
Apr 03, 2023
CAMWATER
SIGNE
38.2 million
FCFA
0011/M/CAMWATER/DG/CIPM/2023
FOURNITURE DES SERVICES DE SECURITE ET GARDIENNAGE A LA CAMWATER EN 4 LOTS
(lot locaux des stations de la DRDA japoma yato, massoumbou)
Apr 03, 2023
MINEE
SIGNE
29.0 million
FCFA
110/LC/MINEE/SG/DAG/SDBMM/SMP/2023
Recrutement d`une société pour l`entretien des services centraux du MINEE
Apr 03, 2023
C_NKAMBE
SIGNE
25.0 million
FCFA
001/JO/NWR/DMD/NK.C/NK.CITB/2023
Construction of a nursery school block at G.B.P.N..S NKAMBE
Apr 03, 2023
C_BAMENDJOU
SIGNE
50.0 million
FCFA
02/M/MINDDEVEL/C-BAM/CIPM/2023
Réhabilitation des points critiques de la Commune de Bamendjou
Apr 03, 2023
C_BAMENDJOU
SIGNE
45.0 million
FCFA
05/LC/MINDDEVEL/C-BAM/CIPM/2023
Travaux de réhabilitation des pistes agricoles des bassins de production de la Commune de Bamendjou
Apr 03, 2023
C_BAMENDJOU
SIGNE
18.0 million
FCFA
06/LC/MINDDEVEL/C-BAM/CIPM/2023
Construction d’un bloc de 02 salles de classe à L’EP de Nket Bameka
Apr 03, 2023
C_BAMENDJOU
SIGNE
50.0 million
FCFA
04/M/MINDDEVEL/C-BAM/CIPM/2023
Electrification du village Batounta 1 en MT/BT 980m+xfo 100KVA
Apr 03, 2023
CAMWATER
SIGNE
580.3 million
FCFA
008/M/CAMWATER/DG/CIPM/2023
FOURNITURE DES SERVICES DE SECURITE ET GARDIENNAGE A LA CAMWATER EN 4 LOTS
(lot 1 DR, yaounde, douala, littoral, sud, est, grand nord)
Apr 03, 2023
C_BAMENDJOU
SIGNE
100.0 million
FCFA
01/M/MINDDEVEL/C-BAM/CIPM/2023
Aménagement de la place centrale de la Commune de Bamendjou
Apr 03, 2023
C_LOKOUNDJE
SIGNE
62.0 million
FCFA
002/M/CIPM/CLKJ/2023
POUR LES TRAVAUX DE CONSTRUCTION DE VINGT (20) BOUTIQUES AU COMPLEXE COMMERCIAL DE BIDOU II (SOCAPALM)
Apr 03, 2023
C_NGUELEBOK
SIGNE
7.0 million
FCFA
005/LC/RE/DK/C.NGBK/CIPM/2023
Mise en place d’une ferme avicole communale
Apr 03, 2023
C_BAMENDJOU
SIGNE
14.9 million
FCFA
03/LC/MINDDEVEL/C-BAM/CIPM/2023
Travaux d’alimentation en eau potable par pompage solaire et distribution gravitaire au centre urbain de BAMENDJOU
Apr 03, 2023
C_BAMENDJOU
SIGNE
14.9 million
FCFA
01/LC/MINDDEVEL/C-BAM/CIPM/2023
Travaux d’alimentation en eau potable par pompage solaire et distribution gravitaire à BATOUNTA 1
Apr 03, 2023
C_BAMENDJOU
SIGNE
20.0 million
FCFA
04/LC/MINDDEVEL/C-BAM/CIPM/2023
Aménagement de l’entrée de la chefferie supérieure Bameka en pavés de pierre
Apr 03, 2023
C_LOKOUNDJE
SIGNE
24.6 million
FCFA
003/LC/CIPM/CLKJ/2023
Travaux d`électrification du village BIPAGA 2
Apr 03, 2023
C_LOKOUNDJE
SIGNE
19.9 million
FCFA
004/LC/CIPM/CLKJ/CIPM/2023
Travaux de Réhabilitation du CPFF de FIFINDA (phase1)
Apr 03, 2023
CAMWATER
SIGNE
160.9 million
FCFA
009/M/CAMWATER/DG/CIPM/2023
FOURNITURE DES SERVICES DE SECURITE ET GARDIENNAGE A LA CAMWATER EN 4 LOTS
(lot 2 DR, nord-ouest, sud-ouest; ouest)
Apr 03, 2023
C_MORA
SIGNE
19.0 million
FCFA
001/LC/C.MORA/CIPM-TBEC/2023
Construction d’un bloc de 2 salles de classe équipées à l`EP Warba
Apr 03, 2023
C_LOKOUNDJE
SIGNE
18.9 million
FCFA
002/LC/CIPM/CLKJ/2023
POUR LES TRAVAUX DE CONSTRUCTION D`UN LOGEMENT D`ASTREINTE A L`EP DE BISSIANG
Apr 03, 2023
C_BAMENDJOU
SIGNE
18.0 million
FCFA
10/LC/MINDDEVEL/C-BAM/CIPM/2023
Construction d’un bloc de 02 salles de classe à L’EP de Medji
Apr 03, 2023
MINHDU
SIGNE
93.6 million
FCFA
0024/E/2/M/MINHDU/CIPM/2023
Travaux de réhabilitation du bâtiment siège du programme de gouvernance Urbaine
Apr 03, 2023
C_BAMENDJOU
SIGNE
27.0 million
FCFA
08/LC/MINDDEVEL/C-BAM/CIPM/2023
Construction d`un hangar de comptoir pour vente de poission au marché central
First
Previous
Page 105 of 532
Next
Last