sort by date sort by cost
Total 4 entries found , Cost: 358.8 million FCFA
Sep 13, 2023 MINTOUL SIGNE 48.9 million FCFA 25/LC/MINTOUL/CIPM/2023
Parc Récréatif d`Ebolowa : Construction de la voie d`accès (Phase 2)
Jun 01, 2022 C_NGAOUNDERE_III SIGNE 10.0 million FCFA 020/LC/CAN3/SG/ST/CIPM
TRAVAUX D`INITIATION A COLLECTE ET VALORISATION DE LA JACINTHE D`EAU DOUCE ET DES AUTRES PLANTES AQUATIQUES ENVAHISSANTES DANS LE LAC DANG
Apr 12, 2018 DR_MINTOUL_SU SIGNE 149.9 million FCFA 006/M/PR/MINMAP/SG/DRMAP-SU/SMI/CRPM/2018
TRAVAUX DE RÉHABILITATION DE LA DIGUE DE PROTECTION DE L’HÔTEL DE L’OCÉAN A KRIBI
Apr 12, 2018 DR_MINTOUL_SU ATTRIBUE 149.9 million FCFA 006/M/PR/MINMAP/SG/DRMAP-SU/SMI/CRPM/2018
TRAVAUX DE RÉHABILITATION DE LA DIGUE DE PROTECTION DE L’HÔTEL DE L’OCÉAN A KRIBI