Construction of a borehole equipped with manual pump MOKEBA FAR
Jul 03, 2021
C_TIKO
SIGNE
12.0 million
FCFA
001/C/MAYOR/TIKO/TCTB/21
Equipping of the mother and child unit at the medicalised health centre Mutengene
Jun 11, 2021
C_LIMBE_III
SIGNE
20.7 million
FCFA
012/JO/LIIIC/FAKO/PIB/2021
Construction of a borehole with distribution network at Man O` Bay
May 03, 2021
C_LIMBE_III
SIGNE
7.9 million
FCFA
NO 005/LIIIC/FAKO/PIB/2021
THE COMPLETION OF BOREHOLE WITH TANK AND DISTRIBUTION NETWORK AT BONANGOMBE LIMBE III
May 03, 2021
C_LIMBE_III
SIGNE
15.8 million
FCFA
NO 004/JO/LIIIC/FAKO/PIB/2021
FOR THE CONSTRUCTION OF TWO MANUEL PUMP BOREHOLES IN UPPER MBONJO-LIMBE III