sort by date sort by cost
Total 2 entries found , Cost: 68.2 million FCFA
May 26, 2020 C_WUM SIGNE 21.9 million FCFA 02/JO/MINDDEVEL/NWR/MCH/WC/WCITB/2020
Construction of a block of two (02) classrooms at G.S. Zatesang Zonghofu
Prestataire: SWIFT CONSTRUCTION ENTERPRISE MISSING
Jan 17, 2020 PDRM RECEPTIONNE 46.3 million FCFA 022/C/MINADER/PDRM-II/COORDO/RPM/CSPM/TBEC/2019
Travaux de construction d`un bloc de trois (03) salles de classe + bureau directeur + deux blocs de trois latrines dans la localité de Mbakoup
Prestataire: SWIFT CONSTRUCTION ENTERPRISE MISSING

Top Authorities
Top Dates