sort by date sort by cost
Total 2 entries found , Cost: 63.3 million FCFA
Oct 27, 2017 IRAD SIGNE 37.9 million FCFA 38//LC/IRAD/DG/DAF/SDBF/SBF/2017
TRAVAUX DE CONSTRUCTION DES INFRASTRUCTURES DANS CERTAINES STRUCTURES OPERATIONNELLES
Prestataire: OJM ACTIVITES MISSING
Mar 23, 2017 DD_MINEE_NYONG_ET_SO'O RECEPTIONNE 25.4 million FCFA 007/LC/MINMAP/DRCE/DDMAP/2017
Travaux de construction de la clôture de la délégation de l`eau et de l`énergie du Nyong et So`o
Prestataire: OJM ACTIVITES MISSING

Top Prestataires
Top Dates