sort by date sort by cost
Total 3 entries found , Cost: 60.5 million FCFA
Apr 12, 2024 CR_NW SIGNE 20.5 million FCFA 021/JO/MINDDEVEL/NWRA/TB/2024
Equipping of multipurpose laboratory in GBHS Kumbo
Apr 12, 2024 CR_NW SIGNE 20.0 million FCFA 022/JO/MINDDEVEL/NWRA/NWRAITB/2024
Equipping of multipurpose laboratory at GBHS Bamendakwe
Jun 12, 2018 CETIC_VALLEE_NCHI SIGNE 20.0 million FCFA 007/LC/PR/MINMAP/SG/DR-OU/DD-NOUN/CDPMPN-TBEC/2018
Construction d`un bloc de deux (02) salles de classe au CETIC DE VALLEE DE NCHI LOT 4

Top Dates