sort by date sort by cost
Total 3 entries found , Cost: 67.5 million FCFA
Nov 24, 2017 MINEPAT SIGNE 39.2 million FCFA ND5/LC/MINEPAT/CMSPM/2017
M.O. DE SUIVI DE L’EXÉCUTION DES TRAVAUX DE RÉHABILITATION DES TRONÇONS DE ROUTE EN TERRE NKOLBISSONG MONTEE EMAH BASILE ET NKOL-CARREFOUR FIANGA
Nov 17, 2017 C_FIGUIL SIGNE 16.4 million FCFA 06/LC/COMMNE-FIGUIL/SG/ST/CIPM/2017
Maîtrise d`œuvre des travaux de construction de l`Hôtel de ville de FIGUIL.
Aug 22, 2017 DRM_EN SIGNE 12.0 million FCFA 073/LC/PR/MINMAP/SG/DREN/CRPM-SPI/SMAS/BSMA/17
Etudes géotechniques du site devant abriter la DREN/MINMAP

Top Dates