Aug 09, 2021
C_NGUELEMENDOUKA
SIGNE
117.4 million
FCFA
002/M/SG/ST/C.NKA/CIPM/2021
Travaux d’entretien du tronçon de Route Régionale NGUELEMENDOUKA – LAMBA – AKOSSA – Limite MBOMA et bretelles (Carrefour LAMBA – Carrefour BATITOUM et LAMBA – MIAMBO) dans l’Arrondissement deNGUELEMENDOUKA
Jul 05, 2021
ANAFOR
SIGNE
23.2 million
FCFA
2245/LC/ANAFOR/DG/SAM/21
TRAVAUX D`ACHEVEMENT DE LA CONSTRUCTION DU BATIMENT ADMINISTRATIF ET COMMERCIAL DE LA PEPINIERE CENTRALE DE MELEN (YAOUNDE) EN 02 LOTS
Jul 05, 2021
ANAFOR
SIGNE
7.5 million
FCFA
2245/LC/ANAFOR/DG/DRP/SAM/21
TRAVAUX D`ACHEVEMENT DE LA CONSTRUCTION DU BATIMENT ADMINISTRATIF ET COMMERCIAL DE LA PEPINIERE CENTRALE DE MELEN (YAOUNDE) EN 02 LOTS