sort by date sort by cost
Total 4 entries found , Cost: 51.5 million FCFA
2024 C_LIMBE_I ATTRIBUE
Construction of Private Wards at CMA Mile 4 in the Limbe Council Council 1 Municipality (Phase 1)
2023 C_LIMBE_I ATTRIBUE
Construction of the Integrated Health Centre - Bonadikombo
Jun 03, 2022 C_DOUALA_V SIGNE 21.0 million FCFA 005/LC/AONO/CAD5è/CIPM/2022
Construction d’un magasin de stockage à MASSOUMBOU
Jun 03, 2022 C_DOUALA_V SIGNE 30.6 million FCFA 006/LC/AONO/CAD5è/CIPM/2022
Construction d’un bloc de 02 salles de classe au GBPS de MASSOUMBOU

Top Prestataires