sort by date sort by cost
Total 2 entries found , Cost: 27.0 million FCFA
2022 CR_SW ATTRIBUE
CONSTRUCTION OF ONE ELECTRIC POWERED BOREHOLE WITH OVERHEAD TANK AND STAND TAPS IN BULU AND MAMFE (Lot 2 - Construction of One Electric Powered Borehole with Overhead Tank and Stand at Taps in Bulu Blind Center Buea)
Prestataire: F.E.B.'S ENTERPRISE MISSING
Aug 16, 2022 C_TIKO SIGNE 27.0 million FCFA 002/C/MAYOR TIKO/TCTB/2022
Rehabilitation of the road stretch from tomatoes market through quarter rubber to osbicol college
Prestataire: F.E.B.'S ENTERPRISE MISSING

Top Authorities
Top Prestataires
Top Dates