sort by date sort by cost
Total 2 entries found , Cost: 58.1 million FCFA
Oct 15, 2020 DR_MINEPAT_AD RECEPTIONNE 18.1 million FCFA 010/LC/H/SDG/SIGAMAP/2020
DR MINEPAT ADAMAOUA : Travaux de construction de la clôture de la DR
May 22, 2020 C_GALIM_TIGNERE SIGNE 40.1 million FCFA 01/LC/R-AD/D-FD/CGT/SG/SIGAM/2020
Aménagement de la Voirie urbaine en terre de GalimTignère
Prestataire: ETS XAVYO GLOBAL SERVICES 10months

Top Dates