sort by date sort by cost
Total 2 entries found , Cost: 30.0 million FCFA
Nov 07, 2018 C_AKONOLINGA SIGNE 22.0 million FCFA 016/LC/CAKGA/SG/CIPM/2018
CONTROLE TECHNIQUE ET SURVEILLANCE DES TRAVAUX DE DESENCLAVEMENT DE CERTAINES PISTES DES GROUPEMENTS OVANG ET MAKAS LOT 1 ET TRAVAUX DE LA 2è PHASE SUR LE TRONCON DJOUDJOUA MEDJAP MEYO MEDAMBENE LOT 2
Prestataire: ETS TIJO ET FRERES INACTIF
Apr 30, 2018 C_AKONOLINGA RECEPTIONNE 8.0 million FCFA 003/LC/CAKGA/SG/CIPM/18
Equipement en matériel médical au CSI de Nkozé
Prestataire: ETS TIJO ET FRERES INACTIF

Top Authorities
Top Prestataires
Top Dates