sort by date sort by cost
Total 4 entries found , Cost: 58.8 million FCFA
2020 C_BANKIM ATTRIBUE
Construction d`un bloc de deux (02) salles de classe au Lycée bilingue de BANKIM
Prestataire: ETS SABIR MULTIPLE
Sep 09, 2020 C_MAGBA RECEPTIONNE 17.9 million FCFA 03/L-C/D-NOUN/C-MGBA/CIPM/AI/2020
EPB DJOUUM 1 construction d’un bloc de 02 salles de classe
Prestataire: ETS SABIR MULTIPLE
Sep 04, 2020 C_MAGBA RECEPTIONNE 27.7 million FCFA 04/L-C/RO/D-NOUN/C-MAGBA/CIPM/AI/2020
Réhabilitation du tronçon Mamokimo – Pomi village (11km)
Prestataire: ETS SABIR MULTIPLE
Jul 13, 2020 C_MAGBA RECEPTIONNE 13.2 million FCFA 02/DC/RO/D-NOUN/C-MAGBA/CIPMP-AG/2020
FOURNITURE DES MATÉRIELS SCOLAIRES ET PEDAGOGIQUES (Paquet Minimum) DANS L`ARRONDISSEMENT DE MAGBA
Prestataire: ETS SABIR MULTIPLE

Top Prestataires
Top Dates