sort by date sort by cost
Total 4 entries found , Cost: 154.6 million FCFA
Feb 17, 2020 C_MBOUDA ATTRIBUE 32.3 million FCFA 19/LC/CMDA/CIPM/2020
CONSTRUCTION DU PONT SUR LA MASSA ET LA RIVIERE MEZZI AVENUE SOUMO GROUPEMENT BABETE
Prestataire: ETS POINT CARRE MULTIPLE
Sep 10, 2019 PREF_BAMBOUTOS SIGNE 49.5 million FCFA 012/LC/F31/SAEF/CDPM/2019
CONSTRUCTION D UN PONT DEFINITIF SUR LE TRONCON MATITI DES EVEQUES - CARREFOUR MATITI - MBOUDA
Prestataire: ETS POINT CARRE MULTIPLE
Apr 12, 2019 C_MBOUDA RECEPTIONNE 45.0 million FCFA 05/LC/C MDA/CIPM/2019
COMMUNE DE MBOUDA : Réhabilitation de 04 pistes agricoles de (15 km) : NDOUNTSEU-BATCHIPA (6km), MBOUMETIO-BATCHIPA 7(4km), BAMEKA-MARCHE MOKOLO (3km), NDUTI-BALATCHI (2km)
Prestataire: ETS POINT CARRE MULTIPLE
Apr 12, 2019 C_MBOUDA SIGNE 27.8 million FCFA 06/LC/C MDA/CIPM/2019
Réhabilitation du tronçon de route du groupement BAMESSINGUE
Prestataire: ETS POINT CARRE MULTIPLE

Top Prestataires
Top Dates