sort by date sort by cost
Total 9 entries found , Cost: 169.2 million FCFA
Jun 20, 2023 C_EBEBDA SIGNE 15.0 million FCFA 0002/LC/C.EBDA/CIPM/2023
REHABILITATION DU PONT SUR LA RIVIERE NGWE A NEGA EN BETON ARME AU PK 0 100KM
Jun 20, 2023 C_EBEBDA SIGNE 10.0 million FCFA 002/LC/C.EBDA/CIPM/23
REHABILITATION DU PONT NGWE SUR LE TRONCON LEDONG NGOKSA EN BETON ARME
Jun 19, 2023 C_EBEBDA SIGNE 20.6 million FCFA 011/M/EBEBDA/CIPM/23
CONSTRUCTION D`UN FORAGE EQUIPE DE POMPE A ENERGIE SOLAIRE EBONG
Jun 19, 2023 C_EBEBDA SIGNE 20.6 million FCFA 0011/M/C.EBEBDA/CIPM/2023
CONSTRUCTION D`UN FORAGE EQUIPE DE POMPE A ENERGIE SOLAIRE A LENYONG
Jun 19, 2023 C_EBEBDA SIGNE 20.6 million FCFA 011/M/D/C.EBEBDA/CIPM/23
CONSTRUCTION D`UN FORAGE EQUIPE DE POMPE A ENERGIE SOLAIRE A NLONG ZOCK
Jun 19, 2023 C_EBEBDA SIGNE 20.6 million FCFA 11/M/EBEBDA/CIPM/2023
CONSTRUCTION D`UN FORAGE EQUIPE DE POMPE A ENERGIE SOLAIRE A NKOUM I
Jun 19, 2023 C_EBEBDA SIGNE 20.6 million FCFA 11/M/D/C/EBEBDA/CIPM/23
CONSTRUCTION D`UN FORAGE EQUIPE DE POMPE A ENERGIE SOLAIRE A NDOUNDA
Jun 19, 2023 C_EBEBDA SIGNE 20.6 million FCFA 11/M/EBEBDA/CIPM/23
CONSTRUCTION D`UN FORAGE EQUIPE DE POMPE A ENERGIE SOLAIRE KOAN
Jun 19, 2023 C_EBEBDA SIGNE 20.6 million FCFA 11/M/C.EBEBDA/CIPM/2023
CONSTRUCTION D`UN FORAGE EQUIPE DE POMPE A ENERGIE SOLAIRE ENDOUM

Top Authorities
Top Dates