sort by date sort by cost
Total 3 entries found , Cost: 9.5 million FCFA
Aug 06, 2019 C_EBOLOWA_I RECEPTIONNE 18486 FCFA 005/LC/C-EBWA1/CIPM/2019
Construction d`un bloc de 02 salles de classe à EP ENGOM 1
Prestataire: ETS LAMATCHE.COM MISSING
Sep 02, 2019 C_EBOLOWA_I SIGNE 9.5 million FCFA 006/LC/C-EBWA1/CIPM/2019
Achèvement de la construction de Ecole primaire de MVIENG
Prestataire: ETS LAMATCHE.COM MISSING
Aug 06, 2019 C_EBOLOWA_I SIGNE 18486 FCFA 005/LC/C-EBWA1/CIPM/2019
Construction d`un bloc de 02 salles de classe à EP ENGOM 1
Prestataire: ETS LAMATCHE.COM MISSING

Top Authorities
Top Prestataires
Top Dates