sort by date sort by cost
Total 2 entries found , Cost: 110.3 million FCFA
Aug 12, 2022 C_GALIM_TIGNERE RECEPTIONNE 12.0 million FCFA 19/LC/R-AD/D-FD/CGT/SG/SIGAMP/2022
Eclairage public par lampadaires solaires (07) de la ville de Galim- Tignere
Prestataire: ETS KALIPHA MISSING
Jan 31, 2022 C_DIR SIGNE 98.3 million FCFA 10/M/C.DIR/CIPM/2022
TRAVAUX DE CONSTRUCTION DE 11 FORAGES DES PMH DANS LES LOCALITES DE : EP DE BEYALA EP DE RAOUZANAM EP DE GBINAKO QUARTIER KONTCHA DANS LA VILLE DE DIR QUARTIER YAYOUWE (LIEU DIT BOFORO-DIR) DANS LA VILLE DE DIR EP DE LAMOU EP DE WAAH EP DE GAZAGADE EP DE TOMEDO EP DOUA VILLAGE GBAGO
Prestataire: ETS KALIPHA MISSING

Top Prestataires
Top Dates