sort by date sort by cost
Total 4 entries found , Cost: 39.4 million FCFA
2023 C_NKUM ATTRIBUE
Construction of two (02) modern wells equipped/ empowered by solar energy in Tatum, Nkum Sub Division
2023 C_NKUM ATTRIBUE
Construction of a block of two (02) classrooms and Head Teachers office at GS Tatum
May 25, 2023 C_NKUM SIGNE 20.0 million FCFA 003/JO/NC/NCITB/2023
Construction of a block of two (02) classrooms and Head Teachers office at GS Tatum
May 25, 2023 C_NKUM SIGNE 19.4 million FCFA 002/JO/NC/NCITB/2023
Construction of two (02) modern wells equipped/ empowered by solar energy in Tatum, Nkum Sub Division

Top Authorities
Top Dates