sort by date sort by cost
Total 6 entries found , Cost: 105.4 million FCFA
2022 C_LEMBE_YEZOUM ATTRIBUE
Construction d`un pavillon meres-enfants au CMA de Lembe
Prestataire: ETS GAMA MULTIPLE
Jun 22, 2022 C_BANGANGTE RECEPTIONNE 24.7 million FCFA 18/LC/PR/MINMAP/DRO/DDNDE/C-BGTE/SPM/CIPM/2022
Installation des lampadaires solaires dans la Commune de Bangangté (Lot 1)
Prestataire: ETS GAMA MULTIPLE
Jun 17, 2021 C_OMBESSA SIGNE 15.0 million FCFA 007/LC/C/OMB/SG/SPM/CIPM/2021
Equipement en énergie solaire au CMA d`Ombessa:
Prestataire: ETS GAMA MULTIPLE
Feb 22, 2021 MINEDUB SIGNE 40.8 million FCFA 080/lc/minedub/sg/drfm/sdb/smp/bao/2020
Réhabilitation de l`EP EKOROZOK
Prestataire: ETS GAMA MULTIPLE
2020 CUY ATTRIBUE
TRAVAUX DE CONSTRUCTION DUNE CLÔTURE AUX ALENTOURS DE L’ESPACE VERT SITUE LE CARREFOUR ETOUDIE ET LE CARREFOUR PALAIS
Prestataire: ETS GAMA MULTIPLE
Sep 14, 2020 C_OMBESSA RECEPTIONNE 24.9 million FCFA 04/LC/C/OMB/SG/SPM/CIPM/2020
EM bilingue d’OMBESSA : Construction d’un bloc maternel
Prestataire: ETS GAMA MULTIPLE

Top Prestataires