sort by date sort by cost
Total 4 entries found , Cost: 50.0 million FCFA
2020 C_BANWA ATTRIBUE
TRAVAUX DE REHABILITATION DE LA CASE COMMUNAUTAIRE DE FOTSI-SUD
Prestataire: ETS ENPREC MISSING
2020 C_BANWA ATTRIBUE
TRAVAUX DE CONSTRUCTION DU CENTRE DE LA FEMME ET DE LA FAMILLE
Prestataire: ETS ENPREC MISSING
Sep 29, 2020 C_BAFANG SIGNE 20.0 million FCFA 10/LC/C/BFG/SG/CIPM-TBEC/2020
TRAVAUX DE CONSTRUCTION DU POSTE AGRICOLE DE BAKONDJI
Prestataire: ETS ENPREC MISSING
Sep 29, 2020 C_BAFANG SIGNE 30.0 million FCFA 09/LC/C/BFG/SG/CIPM-BEC/2020
TRAVAUX DE CONSTRUCTION DU FOYER COMMUNAUTAIRE DE BATCHEU
Prestataire: ETS ENPREC MISSING

Top Prestataires
Top Dates