sort by date sort by cost
Total 6 entries found , Cost: 165.7 million FCFA
Jun 26, 2019 C_DEMDENG SIGNE 48.8 million FCFA 007/LC/C-DDG/SG/SIGAMP/CIPMP-DDG/2019
Bitumage du tronçon de route entrée aviateur-FAMWOUO + GRILLE DE NOTATION
Prestataire: ETS ECO-BAT ET TP MISSING
Oct 30, 2017 C_GALIM SIGNE 7.1 million FCFA 19/LC/MINMAP/DR-OU/DD-BTOS/CDPM/2017
FOURNITURE PAQUET MINIMUM DANS LA COMMUNE DE GALIM
Prestataire: ETS ECO-BAT ET TP MISSING
Aug 30, 2017 C_DJEBEM RECEPTIONNE 37.5 million FCFA 010/LC/PR/MINMAP/DR-OU/DD-KK/CDPM-ROUTE/2017
Travaux d`ouverture de la route MEDJI-Foyer FONGANG à Bangang Fondji
Prestataire: ETS ECO-BAT ET TP MISSING
Aug 30, 2017 DD_MINTP_KOUNG_KHI RECEPTIONNE 42.4 million FCFA 009/LC/PR/MINMAP/DR-OU/DD-KK/CDPM-ROUTE/2017
TRAVAUX DE D`OUVERTURE DE LA ROUTE TESSE-VALLEE DU NOUN AVEC RÉHABILITATION D`UN PONT AU PK 15 + 100
Prestataire: ETS ECO-BAT ET TP MISSING
Aug 22, 2017 C_DJEBEM RECEPTIONNE 13.0 million FCFA 011/LC/PR/MINMAP/DR-OU/DD-KK/CDPM-ROUTE/2017
Choulieu-Mpoukouck-Ngwidze: Ouverture d`une piste agricole
Prestataire: ETS ECO-BAT ET TP MISSING
Aug 22, 2017 C_DJEBEM RECEPTIONNE 16.9 million FCFA 008/LC/PR/MINMAP/DR-OU/DD-KK/CDPM-ROUTE/2017
Construction d`un ponceau (sur la rivière VEVE) sur le tronçon place publique chefferie Mouctha-uartier Ntouche
Prestataire: ETS ECO-BAT ET TP MISSING

Top Prestataires
Top Dates