sort by date sort by cost
Total 4 entries found , Cost: 105.1 million FCFA
Aug 02, 2022 C_GAROUA_III RECEPTIONNE 26.6 million FCFA 09/LC/SG/ST/CAG3/CIPM-GRAIII/2022
Construction d`un dalot quadruple à MAYO ANACARDE (4(2,00x2,00) de largeur 8,00 ml).
Prestataire: ETS DORI MULTIPLE
Aug 02, 2022 C_GAROUA_III RECEPTIONNE 23.3 million FCFA 010/LC/SG/ST/CAG3/CIPM-GRAIII/2022
Construction d`un dalot quadruple à OURO HAOUSSA (4(2,00x1,50) de largeur 7,00 ml).
Prestataire: ETS DORI MULTIPLE
Jun 17, 2022 C_GASHIGA SIGNE 36.0 million FCFA 014/LC/C-GASCHIGA/CIPM/2022
Construction d`une clôture au CSI de GASCHIGA
Prestataire: ETS DORI MULTIPLE
Jun 06, 2022 C_PITOA RECEPTIONNE 19.3 million FCFA 05/LC/C-PTA/CIPM/2022
Construction d`un magasin au marché de Pitoa
Prestataire: ETS DORI MULTIPLE

Top Prestataires
Top Dates