sort by date sort by cost
Total 7 entries found , Cost: 122.1 million FCFA
Sep 16, 2022 C_EBOLOWA_I SIGNE 25.0 million FCFA 03/LC/AONO/CIPM/CAE1/2022.
Construction d`un bloc maternel à l`école publique d`Amvam-Yevol
Prestataire: ETS DAN ROD 7months
Jun 10, 2021 C_EBOLOWA_I SIGNE 30.0 million FCFA 03/LC/CA-EBWA1/CIPM/2021
Construction d`un centre zootechnique à MEBAE
Prestataire: ETS DAN ROD INACTIF -7months
Jun 08, 2020 C_EBOLOWA_I RECEPTIONNE 8.2 million FCFA 10/LC/CA-EBWA1/CIPM/2020
Équipement en table banc et bureaux de maitre de 4 blocs de 2 salles de classe construits
Prestataire: ETS DAN ROD INACTIF -19months
May 11, 2020 C_EBOLOWA_I RECEPTIONNE 7.0 million FCFA 08/LC/CAB/CA-EBWA1/2020
Réhabilitation de l`école publique de New Bell
Prestataire: ETS DAN ROD INACTIF -20months
May 11, 2020 C_EBOLOWA_I RECEPTIONNE 18.5 million FCFA 03/LC/CAB/CA-EBWA1/2020
EP : AMVAM-YEVOL construction d’un bloc de 2 salles de classe
Prestataire: ETS DAN ROD INACTIF -20months
Sep 20, 2019 MINATD SIGNE 8.5 million FCFA 005/LC/MINAT/L/SG/CRPM/19
EQUIPEMENT EN MOBILIERS DE BUREAU DE LA DR MINDEVEL / SUD
Prestataire: ETS DAN ROD INACTIF -28months
Apr 17, 2019 DR_MINESEC_SU RECEPTIONNE 24.9 million FCFA 01/M/MINAT/RS/SG/CRPM/2019
Equipement de la Délégation Régionale des Enseignements Secondaires du sSd
Prestataire: ETS DAN ROD INACTIF -33months

Top Prestataires