sort by date sort by cost
Total 10 entries found , Cost: 321.4 million FCFA
Nov 27, 2020 C_BONALEA RECEPTIONNE 20.0 million FCFA 17/LC/C BONALEA/CIPM/2020
Les travaux de rehabilitation du marché de SOUZA
Prestataire: ETS CHARLIE MULTIPLE
Oct 05, 2020 C_DIBAMBA SIGNE 50.0 million FCFA 004/LC/C.DIB/CIPM/2020
CSI DE MISSOLE II : Construction
Prestataire: ETS CHARLIE MULTIPLE
Sep 21, 2020 C_NKONGSAMBA_I RECEPTIONNE 54.0 million FCFA 05/DM/CAN1ER/SG/ST/2020
EP de MBARESSOUMTOU: Construction de 03 blocs de 02 salles de classe
Prestataire: ETS CHARLIE MULTIPLE
Jun 30, 2020 C_ BONALÉA SIGNE 40.0 million FCFA 09/LC/C-BONALEA/CIPM/2020
Souza: Construction d`un hall de marché
Prestataire: ETS CHARLIE MULTIPLE
Jun 29, 2020 C_MOMBO SIGNE 15.5 million FCFA 05/C.MOMBO/ST/20
EPB de mombo : construction d’un bloc de deux salles de classe
Prestataire: ETS CHARLIE MULTIPLE
May 17, 2020 C_NKONG_ZEM RECEPTIONNE 17.3 million FCFA 06/LC/AONO/CIPM/C.NK-ZEM/BEC/2020
Réhabilitation de la route Ro 606 Mairie de Nkong-zem (Lot 3)
Prestataire: ETS CHARLIE MULTIPLE
May 15, 2020 C_BAFOUSSAM_I RECEPTIONNE 50.0 million FCFA 02/LC/CABAF1/MINSANTE/CIPM/2020
CONSTRUCTION DU CENTRE DE SANTE DE DEMSIEM (LOT 1)
Prestataire: ETS CHARLIE MULTIPLE
Apr 17, 2020 C_NKONG_ZEM RECEPTIONNE 9.7 million FCFA 09/LC/AONO/CIPM/C.NK-ZEM/BEC/2020
Achèvement du pont MAFODOU Kemgho avec aménagement des accès (Lot 1)
Prestataire: ETS CHARLIE MULTIPLE
Apr 17, 2020 C_NKONG_ZEM RECEPTIONNE 27.7 million FCFA 07/LC/AONO/CIPM/C.NK-ZEM/BEC/2020
Travaux de réhabilitation : Piste 1 : Inter AO 606 –Tsobing -Lekatchouo 3,5 km Piste 2 : Monté Koanong, 0,8 km (Lot 2)
Prestataire: ETS CHARLIE MULTIPLE
Mar 13, 2020 CU_BAFOUSSAM RECEPTIONNE 37.2 million FCFA 01/LC/CU/BFM/CLS-C2D-BFM/CIPM/2020
RACCORDEMENT DE CERTAINES LATRINES EN EAU POTABLE ET REALISATION DE DEUX FORAGES EQUIPES DE POMPE A MOTRICITE HUMAINE DANS LE CADRE DU PROJET SERVICE URBAIN DU PROGRAMME CD2 CAPITALES REGIONALES VILLE DE BAFOUSSAM
Prestataire: ETS CHARLIE MULTIPLE

Top Prestataires
Top Dates