sort by date sort by cost
Total 3 entries found , Cost: 344.9 million FCFA
Aug 16, 2018 MINATD SIGNE 79.5 million FCFA 1985/M/MINAT/CPM/2018
Bogo: Reprogrammation du projet de construction de la résidence du Sous-préfet (Lot 4)
Prestataire: ETS BAHOU &CIE MISSING
Aug 16, 2018 MINATD SIGNE 79.5 million FCFA 1983/M/MINAT/CPM/2018
CONSTRUCTION DES RESIDENCES DE CERTAINS SOUS-PREFETS LOT5
Prestataire: ETS BAHOU &CIE MISSING
Aug 16, 2018 MINATD SIGNE 185.9 million FCFA 1986/m/minat/cpm/2018
Mokolo: Construction de la Préfecture
Prestataire: ETS BAHOU &CIE MISSING

Top Authorities
Top Prestataires
Top Dates