sort by date sort by cost
Total 4 entries found , Cost: 111.3 million FCFA
Jul 17, 2022 C_NGAOUNDERE_II SIGNE 11.0 million FCFA 05/LC/CAN2/2022
Construction de la cloture du CSI du Nord CIFAN (Phase1)
Prestataire: ETS AMOD MULTIPLE
Jun 20, 2022 C_GALIM_TIGNERE SIGNE 40.0 million FCFA 06/LC/R-AD/D-FD/C-GT/SG/SIGAMP/2022
Construction de 15 boutiques au marché de Galim-Tignere
Prestataire: ETS AMOD MULTIPLE
Apr 27, 2022 C_NGAOUNDERE_II SIGNE 38.9 million FCFA 20/LC/CANII/CIPM/2022
TRAVAUX DE CONSTRUCTION DE 02 PARCS D`INTERVENTION ZOO SANITAIRES EQUIPES CHACUN D`UN BLOC LATRINES VIP A MAYO DANEYEL ET MBAOURE
Prestataire: ETS AMOD MULTIPLE
Apr 27, 2022 C_NGAOUNDERE_II SIGNE 21.5 million FCFA 19/LC/CANII/CIPM/2022
TRAVAUX DE MATERIALISATION DE 02 PISTES A BETAIL A MBALANG DJALINGO ET MAYO DANEYEL
Prestataire: ETS AMOD MULTIPLE

Top Prestataires
Top Dates