sort by date sort by cost
Total 7 entries found , Cost: 101.6 million FCFA
supply of medical Equipment to some integrated Health Centers (IHCs) all in Nwa lot 2 YANG
2018 C_ZHOA ATTRIBUE
Supply of medical equipment to the Integrated Health Center Esu, Fungom Sub-Division Lot 3
supply of medical Equipment to some integrated Health Centers (IHCs) all in Nwa lot 1 ntong
Oct 25, 2018 C_TUBAH SIGNE 28.3 million FCFA 05/JO/TC/TCITB/2018
Construction of a Zootechnical and Verterinary Center in Tubah
Apr 23, 2018 C_FUNDONG RECEPTIONNE 8.0 million FCFA 005/JO/MINMAP/RDNW/DDBOYO/DTB/2018
supply of Medical equipment at IHC Konene
Prestataire: ETS AL GAMBO AND BROS INACTIF
Apr 11, 2018 HD_OKU SIGNE 45.9 million FCFA 05/18/JO/MINMAP/DDB/2018
SUPPLY OF ELECTRICITY NETWORK TO MBAM VILLAGE
Prestataire: ETS AL GAMBO AND BROS INACTIF
Mar 27, 2018 GSS_NGOLAIN SIGNE 19.5 million FCFA 02/JO/MINMAP/RDNW/DDBOYO/DTB/2018
Construction of a block of two classrooms at GSS Ngolain Lot 1
Prestataire: ETS AL GAMBO AND BROS INACTIF

Top Prestataires
Top Dates