Réhabilitation de la route N1 carrefour Manwi – Mbidjoro- carrefour base BIR
FOURNITURE DU PAQUET MINIMUM A LA COMMUNE DE NYAMBAKA
Oct 14, 2022
C_NGANHA
SIGNE
16.1 million
FCFA
07/LC/CNGANHA/CIPM/2022
LIVRAISON DES FOURNITURES PÉDAGOGIQUES ET SCOLAIRES /PAQUETS MINIMA DES ÉCOLES DANS LA COMMUNE DE NGAN HA
Jul 04, 2022
C_NGAOUI
SIGNE
26.0 million
FCFA
003LC/C-NG/SG/CIPM/2022
Rehabilitation de la route KAOUTAL-DIEL
Jun 22, 2022
C_NYAMBAKA
SIGNE
30.0 million
FCFA
05/LC/CNY/SG/SIGAMP/CIPM/2022
Construction d`un ponceau sur le Mayo Péro
Jun 22, 2022
C_NYAMBAKA
SIGNE
10.0 million
FCFA
06/LC/CNY/SG/SIGAMP/CIPM/2022
Réhabilitation du bloc de salle de classe de Sadol Mana
TRAVAUX DE CONSTRUCTION DE CINQ DALOTS EN BÉTON ARME SUR L4AXE NDO MBELLE-DARANG et RÉHABILITATION DES POINTS CRITIQUES DE LA ROUTE SUR 02 km
TRAVAUX DE CONSTRUCTION D`UN BLOC DE DEUX (02) SALLES DE CLASSE EQUIPEES DE 60 TABLES BANCS AVEC UN BLOC DE TROIS LATRINES ECOLOGIQUES A L`ECOLE PUBLIQUE DE GADA DANG
Mar 30, 2022
SYNCOM_MBERE
SIGNE
19.5 million
FCFA
01/LC/SCM/CD/CIPM/2022
TRAVAUX DE DE CONSTRUCTION DE DEUX FORAGES EQUIPES DES POMPES A MOTRICITE HUMAINE (PMH) DANS LES LOCALITES DE WAAH (COMMUNE DE DIR) BAWAKA OUMAROU / BAWAKA KOE (COMMUNE NGAOUI) DANS LE DEPARTEMENT DU MBERE, REGION DE L`ADAMAOUA
Jan 31, 2022
C_MEIGANGA
SIGNE
79.7 million
FCFA
003/M/C.MGA/CIPM/2022
TRAVAUX DE CONSTRUCTION ET EQUIPEMENT DU CSI ET LA CONTRUCTION D UN BLOC LATRINES ECOLOGIQUESA 03 CABINES A MEIDOUGOU
Jan 31, 2022
C_MEIGANGA
SIGNE
63.6 million
FCFA
005/M/C.MGA/CIPM/2022
TRAVAUX DE CONSTRUCTION DE 15 BOUTIQUES ET D UN BLOC LATRINES ECOLOGIQUES A 03 CABINES AU MARCHE DE GOUNBELA