sort by date sort by cost
Total 4 entries found , Cost: 189.5 million FCFA
Jan 15, 2018 C_MOGODE SIGNE 49.5 million FCFA 004/M/C-MOG/CIPM/2017
CONSTRUCTION DE (05) FORAGES PRODUCTIFS DE PMH A MOGODE? ep KILA ? lYCEE bILINGUE DE RHUMSIKI GOURIA KAMA ET KOLOWA DANS LA COMMUNE DE MOGODE
Prestataire: ETS ABDOULAYE ALI MULTIPLE
Dec 14, 2017 C_MERI RECEPTIONNE 50.0 million FCFA 22/LC/C.MERI/CIPM/BEC/2017
Construction d`un Centre de Santé Intégré au Cétic de HOULOUM (lot 1)
Prestataire: ETS ABDOULAYE ALI MULTIPLE
Aug 03, 2017 C_MOGODE RECEPTIONNE 40.0 million FCFA 062/LC/MINMAP/DREN/CRPM-AI/SMAS/CBSA/17
Construction d’un forage pastoral à énergie solaire à Meleheleh-Kortchi et NORA
Prestataire: ETS ABDOULAYE ALI MULTIPLE
Jun 05, 2017 C_TOKOMBERE RECEPTIONNE 50.0 million FCFA 001/M/C.TOK/CIPM-BEC/2017
Construction du CMPJ TOKOMBERE
Prestataire: ETS ABDOULAYE ALI MULTIPLE

Top Prestataires
Top Dates