sort by date sort by cost
Total 2 entries found , Cost: 60.7 million FCFA
Sep 25, 2019 C_BANKA SIGNE 26.0 million FCFA 05/LC/C/BKA/CIPM-AI/2019
REHABILITATION DU SYSTEME D`ADDUCTION D`EAU POTABLE DU VILLAGE BABOATE
Oct 16, 2017 MINTP RECEPTIONNE 34.7 million FCFA 074/LC/MINMAP/DR-NO/CRPMP/SMI/2018
Travaux de Réhabilitation de la Résidence du Directeur du CMTP de Garoua
Prestataire: DTZ ENGINEERING SARL INACTIF

Top Authorities
Top Prestataires
Top Dates