sort by date sort by cost
Total 3 entries found , Cost: 310.0 million FCFA
Jul 08, 2021 C_ISANGUELE SIGNE 275.0 million FCFA 007/C/BADEPP/2021
CONSTRUCTION OF THE FISHERMEN HOSTEL (STUDY AND EXECUTION IN IDABATO) AND HOUSING MATERIALS AND TECHNICAL SUPPORTS
Jul 08, 2021 C_ISANGUELE SIGNE 20.0 million FCFA 010/JO/BADEPP/2021
CONTROL MISSION OF THE CONSTRUCTION OF A WHARF AT NEW BEACH ISANGELE
Jul 08, 2021 C_ISANGUELE SIGNE 15.0 million FCFA 07b/JO/BADEPP/2021
CONTROL MISSION OF THE CONSTRUCTION OF A FISHERMEN HOSTEL(STUDY AND EXECUTION) IN IDABATO

Top Authorities
Top Dates