sort by date sort by cost
Total 4 entries found , Cost: 717.2 million FCFA
2023 MINAC ATTRIBUE
Construction de la maison de la culture de Nanga-Eboko (Phase 3)
May 22, 2023 MINAC SIGNE 71.8 million FCFA 10/M/MINAC/SG/DAG/SDBMM/SMAR/2023
Construction de la maison de la culture de Nanga-Eboko (Phase 3)
Apr 17, 2023 CR_LT SIGNE 443.5 million FCFA 01/M/CR-LT/AONO/CIPM/2023
TRAVAUX D’EXTENSION DE L’IMMEUBLE SIEGE DU CONSEIL REGIONAL LITTORAL.
Apr 17, 2023 CR_LT SIGNE 202.0 million FCFA 02/M/CR-LT/AONO/CIPM/2023
TRAVAUX DE RÉHABILITATION DE LA CLOTURE ET L’AMÉNAGEMENT DES VOIRIES ET RESEAUX DIVERS (VRD) AU SIEGE DU CONSEIL REGIONAL LITTORAL.

Top Authorities
Top Dates