sort by date sort by cost
Total 2 entries found , Cost: 98.5 million FCFA
2021 PREF_MEZAM ATTRIBUE
Construction of a sub divisional inspectorate of basic education in Bafut
Prestataire: CONCEPT ENGINEERING CAMEROUN MISSING
Sep 30, 2021 MINAT SIGNE 98.5 million FCFA 002759/M/MINAT/2021
Construction de la Sous-préfecture de BATCHENGA
Prestataire: CONCEPT ENGINEERING CAMEROUN MISSING

Top Dates