sort by date sort by cost
Total 4 entries found , Cost: 179.6 million FCFA
2020 C_BELO ATTRIBUE
Mejung village: Rural electrification project
Prestataire: CONCEPT ENGINEERING CAMEROUN MISSING
Oct 08, 2020 MINAT SIGNE 80.0 million FCFA 090/M/MINAT/2020
Construction de la résidence du sous-préfet d`Ebolowa 1
Prestataire: CONCEPT ENGINEERING CAMEROUN MISSING
Oct 08, 2020 MINAT SIGNE 89.6 million FCFA 066/M/MINAT/2020
Construction de la sous-préfecture de Ngomedzap
Prestataire: CONCEPT ENGINEERING CAMEROUN MISSING
Apr 29, 2020 DD_MINEE_MOMO SIGNE 10.0 million FCFA 004/JO/NW06/DTB/SEFA/BIP/2020
THE RURAL ELECTRIFICATION OF EFAH VILLAGE IN BATIBO SUBDIVISION
Prestataire: CONCEPT ENGINEERING CAMEROUN MISSING

Top Dates