Equipment of GBPS Tombel & GS Kupe
Jul 26, 2022
CR_SW
SIGNE
30.0 million
FCFA
024/JO/SWR/SWRA/ITB/BUEA/2022
FOR THE RENOVATION OF THE ROOF OF BLOCK ``A`` BUILDING AND CONSTRUCTION OF A WALK-WAY LINKING BLOCK ``A`` AND BLOCK ``B`` AT THE DISTRICT HOSPITAL MUNDEMBA
Construction of a block of two(02) classrooms at GPS group 4 Tombel